Saturday, August 31, 2019
Hydraulic Design of Small Hydro Plants
Version 2 STANDARDS/MANUALS/ GUIDELINES FOR SMALL HYDRO DEVELOPMENT Civil Works ââ¬â Hydraulic Design Of Small Hydro Plants Lead Organization: Sponsor: Alternate Hydro Energy Center Indian Institute of Technology Roorkee Ministry of New and Renewable Energy Govt. of India May 2011 AHEC/MNRE/SHP Standards/ Civil Works ââ¬â Guidelines For Hydraulic Design Of Small Hydro Plants /May 2011à à 1 1. GUIDELINES FOR HYDRAULIC DESIGN OF SMALL HYDRO PLANTS This section provides standards and guidelines on the design of the water conductor system.This system includes; head works and intake, feeder canal, desilter (if required), power canal or alternative conveyance structures (culverts, pipelines, tunnels, etc), forebay tank, penstock and surge tank (if required) up to the entry of the turbine, tailrace canal below the turbine and related ancillary works. 1. 1 HYDRAULIC DESIGN OF HEAD WORKS In general head works are composed of three structural components, diversion dam, intake and b ed load sluice. The functions of the head works are: Diversion of the required project flow from the river into the water conductor system.Control of sediment. Flood handling. Typically a head pond reservoir is formed upstream of the head works. This reservoir may be used to provide daily pondage in support of peaking operation or to provide the control volume necessary for turbine operation in the water level control mode. This latter case would apply where the penstock draws its water directly from the head pond. Sufficient volume must be provided to support these functions. There are three types of head works that are widely used on mini and small hydro projects, as below: Lateral intake head works Trench intake head worksReservoir / canal intakes Each type will be discussed in turn. 1. 1. 1 Head Works with Lateral Intakes (Small Hydro) Head works with lateral intakes are typically applied on rivers transporting significant amounts of sediment as bed load and in suspension. The f unctional objectives are: To divert bed-load away from the intake and flush downstream of the dam (the bed load flushing system should be operable in both continuous and intermittent modes). To decant relatively clean surface water into the intake. To arrest floating debris at intake trashracks for removal by manual raking.To safely discharge the design flood without causing unacceptable upstream flooding. AHEC/MNRE/SHP Standards/ Civil Works ââ¬â Guidelines For Hydraulic Design Of Small Hydro Plants /May 2011à à 2 The following site features promote favourable hydraulic conditions and should be considered during site selection: The intake should be located on the outside of a river bend (towards the end of the bend) to benefit from the spiral current in the river that moves clean surface water towards the intake and bed load away from the intake towards the centre of the river.The intake should be located at the head of a steeper section of the river. This will promote remo val of material flushed through the dam which may otherwise accumulate downstream of the flushing channel and impair its function. Satisfactory foundation conditions. Ideal site conditions are rare, thus design will require compromises between hydraulic requirements and constraints of site geology, accessibility etc. The following guidelines assume head works are located on a straight reach of a river. For important projects or unusual sites hydraulic model studies are recommended.A step by step design approach is recommended and design parameters are suggested for guidance in design and layout studies. Typical layouts are shown in Figures 2. 2. 1 to 2. 2. 3. 1. 1. 2 Data Required for design. The following data are required for design: Site hydrology report as stipulated in Section 1. 3 of this Standard giving: ââ¬â Qp (plant flow) ââ¬â Q100 (design flood flow, small hydro) ââ¬â Q10 (design flood flow, mini hydro) (data on suspended sediment loads) ââ¬â Cw ââ¬â H -Q Curves (W. L. rating curves at diversion dam) Topographic mapping of the site including river bathymetry covering all head works structure sites.Site geology report. 1. 1. 3 Site Selection: Selection of the head works site is a practical decision which involves weighing of several factors including hydraulic desiderata (Section 2. 2. 1/1. 0), head optimization, foundation conditions, accessibility and constructability factors. Given the importance of intake design to the overall performance of the plant it is recommended that an experienced hydraulic engineer be consulted during studies on head works layout. 1. 1. 4 Determination of Key Elevations: AHEC/MNRE/SHP Standards/ Civil Works ââ¬â Guidelines For Hydraulic Design Of Small Hydro Plants /May 2011à à 3For the illustrative example: Qp = 10. 0 m3/s Determine V0 = 0. 5 Q0. 2 (= 0. 792, say 0. 80 m/s) (= 12. 5 m2) A0 = Q ? V0 A0 H= (= 1. 77 m, say 1. 80 m) 4 Assume L = 4H (= 7. 08 m, say 7. 0 m) ye = greater of 0. 5 yo o r 1. 5 m (= 1. 80m) yd = L. S (= 0. 28 m) NOL = Z0 + ye + yd + H NOL = 97. 5 + 1. 80 + 0. 28 + 1. 80 (=101. 38m, say 101. 50 m) Sill = NOL ââ¬â H (= 99. 7m) Crest of weir or head pond NOL = 101. 5 m Height of weir = 4. 0 m These initial key elevations are preliminary and may have to be adjusted later as the design evolves. 1. 1. 5 Head Works LayoutThe entry to the intake should be aligned with the river bank to provide smooth approach conditions and minimize the occurrence of undesirable swirl. A guide wall acting as a transition between the river bank and the structure will usually be required. Intake hydraulics are enhanced if the intake face is slightly tilted into the flow. The orientation of the intake face depends on river bank topography, for straight river reaches the recommended values for tilt vary from 10o to 30o depending on the author. When this angle becomes too large the intake will attract excessive amounts of sediment and floating debris.It is recommended that t he sill level of the intake is kept sufficiently higher than the sill level of the under sluice. The under sluice should be located adjacent to the intake structure. AHEC/MNRE/SHP Standards/ Civil Works ââ¬â Guidelines For Hydraulic Design Of Small Hydro Plants /May 2011à à 4 For development of the head work plan, it is recommended that the following parameters be used for layout: Axis of intake should between 100à ° to 105à ° to axis of diversion structure The actual inclination may be finalized on the basis of model studies. Divide wall, if provided, should cover 80% to 100% of the intake.Assume flushing flow equal to twice project flow then estimate the width and height of the flushing gate from orifice formula,: Example should be in appendix. Qf = 0. 6 ? 0. 5W2 Where: Qf = flushing flow W = gate width H = gate height (= 0. 5W) Yo = normal flow depth as shown in 2. 2. 1. 1/2. 0 Sill should be straight and perpendicular to the flow direction. In the sample design (Fig. 2 . 2. 1. 1) the axis of the intake = 105à ° & Qf = 2. 0? 10. 0 = 20m3/s ? 20. 0 = 0. 6 ? 0. 5 W2 ? W = 2. 8 m (say 3. 0m) and H = 1. 5 m. 1. 1. 6 Flood Handling, MFL and Number of Gates.For small hydro a simple overflow diversion weir would be the preferred option if flood surcharge would not cause unacceptable upstream flooding. For purpose of illustration, the following design data are assumed (see Figure 2. 2. 2): Design flood, Q100 = 175 m3/s A review of reservoir topography indicated that over bank flooding would occur if the flood water level exceeded 103. 0 m. Select this water level as the MFL. This provides a flood surcharge (S) of 1. 20 m. Assume weir coefficients as below: Gate, Cw = 1. 70 ââ¬â ââ¬â ââ¬â sill on slab at river bottom. Weir, Cw = 1. 0 ââ¬â ââ¬â ââ¬â ââ¬â ââ¬â ââ¬â -ogee profile. Assume gate W/H ratio = 1:2 H = 4. 0 m ? W = 4. 8 (say 5. 0 m) MFL. = NOL + 1. 50 (= 103. 0m) Qgate = Cw. W. (MFL ââ¬â ZS)1.. 5 Qweir = Cw. L w. S1. 5 Capacity check for MFL = 103. 0 m No. of Length of Overflow QG Gates Section (m) (m3/s) 0 35. 0 0. 0 1 29. 0 109. 6 QW (m3/s) 82. 8 68. 6 QT (m3/s) 82. 8 178. 2 >175 AHEC/MNRE/SHP Standards/ Civil Works ââ¬â Guidelines For Hydraulic Design Of Small Hydro Plants /May 2011à à 5 Therefore one gate is sufficient. Where: MFL = Maximum flood level (m) NOL = Normal operating level (m) S = flood surcharge above NOL (m)W = width of gate (m) H = height of gate (m) ZS = elevation of gate sill (m) = weir coefficient (m0. 5s-1) Cw QG, QW, QT = gate, weir and total flows The flow capacity of the sediment flushing gate may also be included in calculating flood handling capacity. 1. 1. 7 Diversion structure and Spillway Plains Rivers: Stability of structures founded on alluvial foundations typical of plains rivers, is governed by the magnitude of the exit gradient. The critical gradient is approximately 1. 0 and shall be reduced by the following safety factors: Types of foundationS hingles / cobbles Coarse sand Fine sand Safety factor 5 6 7 Allowable Exit Gradient 0. 20 0. 167 0. 143 Also diversion structures on plains rivers will normally require stilling basins to dissipate the energy from the fall across the diversion structure before the water can be returned safely to the river. Design of diversion weirs and barrages on permeable foundation should follow IS 6966 (Part 1). Sample calculations in Chapter 12 of ââ¬Å"Fundamentals of Irrigation Engineeringâ⬠(Bharat Singh, 1983) explain determination of uplift pressure distributions and exit gradients.Further details on structural aspects of design are given in Section 2. 3. 3 of this Standard. Mountain Rivers: Bedrock is usually found at relatively shallow depths in mountain rivers permitting head works structures to be founded on rock. Also the beds of mountain rivers are often boulder paved and are much more resistant to erosion than plains rivers. Therefore there may be no need for a stilling basin. The engineer may consider impact blocks on the downstream apron or simply provide an angled lip at the downstream end of the apron to ââ¬Å"flipâ⬠the flow away from the downstream end of the apron.A cut-off wall to bed rock of suitable depth should AHEC/MNRE/SHP Standards/ Civil Works ââ¬â Guidelines For Hydraulic Design Of Small Hydro Plants /May 2011à à 6 also be provided for added protection against undermining by scour. The head works structures would be designed as gravity structures with enough mass to resist flotation. For low structures height less than 2. 0 m anchors into sound bedrock may be used as the prime stabilization element in dam design. Stability and stress design shall be in accordance with requirements of Section 2. 3. 3 of this Standard. 1. 1. 8 Sediment Flushing Channel To be reviewedThe following approach is recommended for design of the flushing channel: Select flushing channel flow capacity (Qf) = 2? Qp Estimate maximum size of sediment ente ring the pocket from site data or from transport capacity of approaching flow and velocity. In case of diversion weir without gates assume sediment accumulation to be level with the weir crest. (Assume continuous flushing with 3? Qp entering the pocket, for this calculation). Establish entrance sill elevation and channel slope assuming an intermittent flushing mode (intake closed) with Qs = 2Qp, critical flow at the sill, supercritical flow downstream (FN ? 1. 0) and a reservoir operating level 0. 5m below NOL. Determine slope of channel to provide the required scouring velocity, using the following formula which incorporates a safety factor of 1. 5: i = 1. 50 io d 9/7 i0 = 0. 44 6 / 7 q Where: io = critical scouring velocity d = sediment size q = flow per unit width (m3/s per m) Verify that flow through pocket in continuous flushing mode (Qs = 3Qs) will be sub critical, if not lower entrance sill elevation further. Determine height of gate and gate opening based on depth of flow at gate location and corresponding gate width. Increase the above theoretical gate height by 0. 5 m to ensure unrestricted open channel flow through the gate for intermittent flushing mode and a flushing flow of 2 Qp. For initial design a width to height ratio of 2:1 for the flushing gate is suggested. 1. 1. 9 Intake/Head Regulator: In intake provides a transition between the river and the feeder canal. The main design objectives are to exclude bed-load and floating debris and to minimize head losses. The following parameters are recommended: Approach velocity at intake entrance (on gross area) 0. 20 Ve = 0. 5 Q p m / s For trashracks that are manually cleaned, V should not exceed 1. 0 m/s.AHEC/MNRE/SHP Standards/ Civil Works ââ¬â Guidelines For Hydraulic Design Of Small Hydro Plants /May 2011à à 7 Convergence of side walls 2. 5:1 with rate of increase in velocity not exceeding 0. 5 m/s per linear m. â⬠¢ Height of sill above floor of flushing channel (ye) = greater of 1. 5 m or 50% flow depth. â⬠¢ The floor of the transition should be sloped down as required to join the invert of the feeder canal. Check that the flow velocity in the transition is adequate to prevent deposition in the transition area. If sediment loads are very high consider installing a vortex silt ejector at the downstream end of the transition. Provide coarse trashracks to guard entry to the head gate. The trashrack would be designed to step floating debris such as trees, branches, wood on other floating objects. A clear spacing of 150 mm between bars is recommended. Trashrack detailed design should be in accordance with IS 11388. â⬠¢ The invert of the feeder canal shall be determined taking into consideration head losses through the trashrack and form losses through the structure. Friction losses can be omitted as they are negligible: V2 Calculate form losses as: H L = 0. 3 2 2g Where: V2 = velocity at downstream end of contraction.Calculate trashrack losses as: 4/3 V2 ?t? H L = K f ? ? . Sin? . 2g ?b? Where: Kf = head loss factor (= 2. 42 assuming rectangular bars) T = thickness of bars (mm) B = clear bar spacing (mm) ? = angle of inclination to horizontal (degrees) V = approach velocity (m/s) 1. 1. 10 References on Lateral Intakes and Diversion Weirs. IS Standards Cited: IS 6966 (Part 1) IS 11388 USBR (1987) Singh, Bharat Nigam, P. S. Hydraulic Design of Barrages and Weirs ââ¬â Guidelines Recommendations for Design of Trashracks for Intakes Design of Small Dams Fundamentals of Irrigation Engineering Nem Chand & Bros. Roorkee (1983) Handbook of Hydroelectric Engineering (Second edition) â⬠¦.. pages 357 to 365 Nem Chand & Bros. ââ¬â Roorkee (1985) 1. 1. 11 Other References: Bucher and Krumdieck Guidelines for the Design of Intake Structures for Small Hydro Schemes; Hydro ââ¬â¢88/3rd International Conference on Small Hydro, Cancun ââ¬â Mexico. Bouvard, M. Mobile Barrages and Intakes on Sediment Transporting AHEC/MNRE/SHP Standards/ C ivil Works ââ¬â Guidelines For Hydraulic Design Of Small Hydro Plants /May 2011à à 8 Razvan, E. 1. 2. Rivers; IAHR Monograph, A. A. Balkema ââ¬â Rotterdam (1992) River Intakes and Diversion DamsElsevier, Amsterdam (1988) SEMI PERMANENT HEADWORKS (MINI HYDRO) For mini hydro projects the need to minimize capital cost of the head works is of prime importance. This issue poses the greatest challenge where the head works have to be constructed on alluvial foundations. This challenge is addressed by adoption of less rigorous standards and the application of simplified designs adapted to the skills available in remote areas. A typical layout is shown in Figure 2. 2. 3. 1. 2. 1 Design Parameters Hydraulic design should be based on the following design criteria: Plant flow Qp) = QT + QD Where: QT = total turbine flow (m3/s) QD = desilter flushing flow (= 0. 20 QT) m3/s QFC = feeder canal flow (= 1. 20 QT) m3/s QF = gravel flushing flow (= 2. 0 QP) Spillway design flow (SDF) = Q10 Where: Q10 = flood peak flow with ten year return period. 1. 2. 2 Layout ? To be reviewed Intake approach velocity = 1. 0 m/s Regulator gate W/H = 2 Flushing channel depth (HD) = 2H + W/3 Flushing channel minimum width = 1. 0 m Assumed flushing gate W/H = 2, determine H from orifice equation, as below: Q f = 0. 53? 2 H 2 . 2 gY1 Y1 = HD for design condition Where: W width of gate (m) H = height of gate (m) Yi = upstream depth (m) = depth of flushing channel (m) HD Select the next largest manufactures standard gate size above the calculated dimensions. 1. 2. 3 Weir AHEC/MNRE/SHP Standards/ Civil Works ââ¬â Guidelines For Hydraulic Design Of Small Hydro Plants /May 2011à à 9 Determine weir height to suit intake gate and flushing gate dimensions, as shown in Figure 2. 2. 3. For weirs founded on permeable foundations the necessary structure length to control failure by piping should be determined in accordance with Section 2. 2. 1/4. 1 of this Standard.A stepped arrangement is recommended for the downstream face of the weir to dissipate hydraulic energy. The height of the steps should not exceed 0. 5 m and the rise over run ratio should not less than 1/3, the stability of the weir cross-section design should be checked for flotation, over turning and sliding in accordance with Section 2. 3. 1. 1. 3 TRENCH INTAKES Trench intakes are intake structures located in the river bed that draw off flow through racks into a trench which conveys the flow into the project water conductor system. A characteristic of trench intakes is that they have minimum impact on river levels.Trench intakes are applied in situations where traditional headwork designs would be excessively expensive or result in objectionable rises in river levels. There are two quite different applications: on wide rivers and on mountainous streams, but the basic equations are the same for both types. The trench intake should be located in the main river channel and be of sufficient width to collect the design project flow including all flushing flows. If the length of the trench is less than the width of the river, cut off walls will be required into each bank to prevent the river from bypassing the structure.Trench weirs function best on weirs with slopes greater than 4%-5%, for flatter slopes diversion weirs should be considered. The spacing between racks is selected to prevent entry of bed load into the trench. The following terms are sometimes used in referring to trench intake designs. Trench weir, when the trench is installed in a raised embankment. â⬠¢ Tyrolean or Caucasian intakes, when referring to trench intakes on â⬠¢ mountainous streams. Features: AHEC/MNRE/SHP Standards/ Civil Works ââ¬â Guidelines For Hydraulic Design Of Small Hydro Plants /May 2011à à 10 1. 3. 2 Design ParametersThe following design parameters are suggested for the dimensioning of trench weirs. â⬠¢ Design Flows: The following design flows are recommended: Bedload flushing flo w (from collector box) = 0. 2 QT â⬠¢ Desilter flushing flow = 0. 2 QT â⬠¢ Turbine flow = 1. 0 QT â⬠¢ Total design flow â⬠¢ = 1. 4 QT Dimensional Layout AHEC/MNRE/SHP Standards/ Civil Works ââ¬â Guidelines For Hydraulic Design Of Small Hydro Plants /May 2011à à 11 The following factors should be considered in determining the principal dimensions: length, breadth and depth of a trench weir: Minimum width (B)= 1. 25 m (to facilitate manual cleaning) Length should be compatible with river cross section. It is â⬠¢ recommended that the trench be located across main river channel. Maximum width (B) ? 2. 50m. Trashrack bars longer than about 2. 50 m â⬠¢ may require support as slenderness ratios become excessive. Invert of collector box should be kept a high as possible. â⬠¢ â⬠¢ Racks â⬠¢ â⬠¢ â⬠¢ â⬠¢ The clear spacing between bars should be selected to prevent entry of bed-load particles that are too large to be conveniently handled by the flushing system. Generally designs are based on excluding particles greater than medium gravel size from (2 cm to 4 cm).A clear opening of 3. 0 cm is recommended for design. A slope across the rack should be provided to avoid accumulation of bed load on the racks. Slopes normally used vary from 0à ° to 20à °. Rectangular bars are recommended. Bar structural dimension shall be designed in accordance with Section 2. 2. 1/5. 0 of this Standard. An appropriate contraction coefficient should be selected as explained in the following sub-section. Assume 30% blockage. Spacing between racks is designed to prevent the entry of bedload but must also be strong enough to support superimposed loads from bedload accumulation, men and equipment.This issue is discussed further in Subsection 2. 2. 3 / 2. 0. 1. 3. 3 Hydraulic Design of Trench Intake The first step in hydraulic design is to decide the width of the trench intake bearing in mind the flow capacity required and the bathymetry of the river bed. The next step in hydraulic design is to determine the minimum trench breadth (B) that will capture the required design flow. The design approach assumes complete capture of river flow, which implies, that river flow is equal to plant flow for the design condition. Hydraulic design is based on the following assumptions: Constant specific energy across racks. â⬠¢ Effective head on screen is equal to base pressure (depth) â⬠¢ Approach velocity is subcritical with a critical section at the entry to the structure as shown in figure 2. 2. 3/1. The set of equations proposed is based on the method given by Lauterjung et al (1989). â⬠¢ First calculate y1: AHEC/MNRE/SHP Standards/ Civil Works ââ¬â Guidelines For Hydraulic Design Of Small Hydro Plants /May 2011à à 12 2 y 1 = k. H0 3 ââ¬â ââ¬â ââ¬â ââ¬â ââ¬â ââ¬â ââ¬â ââ¬â ââ¬â ââ¬â ââ¬â (1) Where: y1 = depth at upstream edge of rack Ho = the energy head of the approach ing flow k = an adjustment factor (m) m) (-) k is a function of inclination of the rack and can be determined from the following table: Values of k as a Function of Rack Slope (? ) Table: 2. 2. 1/1 ? = 0à ° 2à ° 4à ° 6à ° 8à ° 10à ° 12à ° k = 1. 000 0. 980 0. 961 0. 944 0. 927 0. 910 0. 894 ? = 14à ° 16à ° 18à ° 20à ° 22à ° 24à ° 26à ° k = 0. 879 0. 865 0. 851 0. 837 0. 852 0. 812 0. 800 Then calculate the breadth of the collector trench from the following equations (2) to (4) 1. 50 q ââ¬â ââ¬â ââ¬â ââ¬â ââ¬â ââ¬â ââ¬â ââ¬â ââ¬â ââ¬â ââ¬â ââ¬â ââ¬â ââ¬â (2) L= E1. E 2 C. cos? 3/2 . 2gy 1 Where: L = sloped length across collector trench (m) E1 = blockage factor E2 = Effective screen area = e/mC = contraction coefficient ? = slope of rack in degrees y1 = flow depth upstream from Equation 1. (m) q = unit flow entering intake (m3/s per m) e = clear distance between bars (cm or m) m = c/c spacing of bars (cm or m) Assu me E1 = 0. 3 (30%) blockage. ââ¬Å"Câ⬠can be calculated from the following formula (as reported by Raudkivi) Rectangular bars: ?e? C = 0. 66 ? ? ?m? ?0. 16 ?m? .? ? ?h? 0. 13 Assume h = 0. 5 y1. This formula is valid for 3. 5> ââ¬â ââ¬â ââ¬â ââ¬â ââ¬â ââ¬â ââ¬â ââ¬â ââ¬â ââ¬â ââ¬â ââ¬â ââ¬â (3) h e >0. 2 and 0. 15< < 0. 30 m m Finally, the required breadth (B) can be determined as below: B = L cos ? ââ¬â ââ¬â ââ¬â ââ¬â ââ¬â ââ¬â ââ¬â ââ¬â ââ¬â ââ¬â ââ¬â ââ¬â -(4) AHEC/MNRE/SHP Standards/ Civil Works ââ¬â Guidelines For Hydraulic Design Of Small Hydro Plants /May 2011à à 13 1. 3. 4 Hydraulic Design of Collector Trench Normally a sufficient slope on the invert of the trench is provided to ensure efficient flushing of bed-load particles that would otherwise accumulate on the invert of the trench. A suitable scouring slope can be estimated from the following equation: Ss = 0. 66 d 9 / 7 6/7 qo Where: d = sediment size (m) qo = flow per unit width (Q/B) at outlet of trench (m3/s per m) Ss = design slope of trench invert.The minimum depth of the trench at the upstream and is normally between 1. 0m to 1. 5 m, based on water depth plus a freeboard of 0. 3 m. For final design the flow profile should be computed for the design slope and the trench bottom profile confirmed or adjusted, as required. A step-by-step procedure for calculating the flow profile that is applicable to this problem can be found in Example 124, page 342-345 of ââ¬Å"Open-Channel Hydraulicsâ⬠by Ven. T. Chow (1959). In most cases the profile will be sub critical with control from the downstream (exit) end.A suitable starting point would be to assume critical flow depth at the exit of the trench. 1. 3. 5 Collector Chamber The trench terminates in a collector box. The collection box has two outlets, an intake to the water conductor system and a flushing pipe. The flushing pipe must be design with the capacity to flush the bed-load sediment entering from the trench, while the project flow is withdrawn via the intake. The bottom of the collection box must be designed to provide adequate submergence for the flushing pipe and intake to suppress undesirable vortices.The flushing pipe should be lower than the intake and the flushing pipe sized to handle the discharge of bed load. If the flushing pipe invert is below the outlet of the trench, the Engineer should consider steepening the trench invert. If the trench outlet invert is below the flushing pipe invert, the latter should be lowered to the elevation of the trench outlet or below. The deck of the collector box should be located above the design flood level to provide safe access to operate gates. AHEC/MNRE/SHP Standards/ Civil Works ââ¬â Guidelines For Hydraulic Design Of Small Hydro Plants /May 2011à à 14 1. 3. Flushing Pipe The flushing pipe should be designed to provide a high enough velocity to en train bed-load captured by the weir. A velocity of at least 3. 0 m/s should be provided. If possible, the outlet end of the pipe should be located a minimum of 1. 0m above the river bed level to provide energy to keep the outlet area free from accumulation of bed load that could block the pipeline. 1. 3. 7 References on Trench weirs CBIP, (2001): Manual on Planning and Design of Small Hydroelectric Scheme Lauterjung et al (1989): Planning of Intake Structures Freidrich Vieweg and Sohn, Braunswchweig ââ¬â GermanyIAHR (1993): Hydraulic Structures Design Manual: Sedimentation: Exclusion and Removal of Sediment from Diverted Water. By: Arved J. Raudkivi Publisher: Taylor & Francis, New York. Chow (1959): Open- Channel Hydraulics Publisher: McGraw-Hill Book Company, New York. 1. 4 RESERVOIR, CANAL AND PENSTOCK INTAKES The designs of reservoir, canal and penstock intakes are all based on the same principles. However, there are significant variations depending on whether an intake is a t the forebay reservoir of a run-of-river plant or at storage reservoir with large draw down or is for a power tunnel, etc.Examples of a variety of layouts can be fond in IS 9761 Hydropower Intakes ââ¬â Criteria for Hydraulic Design or Guidelines for Design of Intakes for Hydropower Plants (ASCE, 1995). The features common to all designs are shown in the following sketch: AHEC/MNRE/SHP Standards/ Civil Works ââ¬â Guidelines For Hydraulic Design Of Small Hydro Plants /May 2011à à 15 The objectives of good design are: To prevent entry of floating debris. â⬠¢ To avoid formation of air entraining vortices. â⬠¢ To minimize hydraulic losses. â⬠¢ 1. 4. 1 Control of floating debrisTo prevent the entry of debris a trashrack is placed at the entry to the intake. For small hydro plants the trashrack overall size is determined based on an approach velocity of 0. 75 m/s to 1. 0m/s to facilitate manual raking. Trashracks may be designed in panels that can be lowered into p lace in grooves provided in the intake walls or permanently attacked to anchors in the intake face. The trashracks should to sloped at 14à ° from the vertical (4V:1H) to facilitate raking. The spacing between bars is determined as a function of the spacing between turbine runner blades.IS 11388 Recommendations for Design of Trashracks for Intakes should be consulted for information about spacing between trashracks bars, structural design and vibration problems. Also, see Section 2. 2. 1/5 of this Standard. 1. 4. 2 Control of Vortices First of all the direction of approach velocity should be axial with respect the intake if at all possible. If flow approaches at a significant angle (greater than 45o) AHEC/MNRE/SHP Standards/ Civil Works ââ¬â Guidelines For Hydraulic Design Of Small Hydro Plants /May 2011à à 16 from axial these will be significant risk of vortex problems.In such a situation an experienced hydraulic engineer should be consulted and for important projects hydra ulic model studies may be required. For normal approach flow the submergence can be determined from the following formulae: S = 0. 725VD0. 5 S D V = submergence to the roof of the gate section (m) = diameter of penstock and height of gate (m) = velocity at gate for design flow. (m/s) Where: A recent paper by Raghavan and Ramachandran discusses the merits of various formulae for determining submergence (S). 1. 4. 3 Minimization of Head lossesHead losses are minimized by providing a streamlined transition between the entry section and gate section. Minimum losses will be produced when a streamlined bellmouth intake is used. For a bellmouth intake the transition section is formed with quadrants of ellipses as shown in the following sketch. The bellmouth type intake is preferred when ever the additional costs are economically justified. For smaller, mainly mini hydropower stations, simpler designs are often optimal as the cost of construction of curved concrete surfaces may not be offse t by the value of reduction in head losses.Details on the geometry of both types are given â⬠¢ Bellmouth Intake Geometry Geometries for typical run-of-river intakes are shown below: A gate width to height of 0. 785 (D): 1. 00 (H) with H = D is recommended. This permits some reduction in the cost of gates without a significant sacrifice in hydraulic efficiency. There is a second transition between the gate and penstock, rectangular to circular. For a gate having H = D and W= 0. 785D the flow velocity at the gate will be equal to the velocity in the penstock so no further flow acceleration is produced in this section. A length for this transition of 1. x D should be satisfactory. AHEC/MNRE/SHP Standards/ Civil Works ââ¬â Guidelines For Hydraulic Design Of Small Hydro Plants /May 2011à à 17 The head loss co-efficient for this arrangement in Ki =0. 10 Details for layout of bell mouth transitions connecting to a sloping penstock are given in IS9761. â⬠¢ Simplified layout (Mini-Hydro): For smaller/mini hydro projects intake design can be simplified by forming the transition in plane surfaces as shown below: The head loss for this design (Ki) = 0. 19V2/2g. AHEC/MNRE/SHP Standards/ Civil Works ââ¬â Guidelines For Hydraulic Design Of Small Hydro Plants /May 2011à à 18 . 4. 4. AIR VENT An air vent should be placed downstream of the head gate to facilitate air exchange between atmosphere and the penstock for the following conditions: â⬠¢ Penstock filling when air will be expelled from the penstock as water enters. â⬠¢ Penstock draining when air will enter the penstock to occupy the space previously filled by water. The air vent (pipe) must have an adequate cross section area to effectively handle these exchanges of air. The following design rules are recommended: Air vent area should the greater of the following values Where: (m3/s) AV = 0. 0 Ap or QT AV = 25. 0 (m2) AV = cross-section area of air vent pipe AP = cross-section area of penst ock (m2) QP = turbine rated flow ( ? QT of more than one turbine on the penstock) The air vent should exhaust to a safe location unoccupied by power company employees on the general public. 1. 4. 5 PENSTOCK FILLING A penstock should be filled slowly to avoid excessive and dangerous ââ¬Å"blowbackâ⬠. The recommended practice is to control filling rate via the head gate. The AHEC/MNRE/SHP Standards/ Civil Works ââ¬â Guidelines For Hydraulic Design Of Small Hydro Plants /May 2011à à 19 ead gate should not be opened more than 50 mm until the penstock is completely full. (This is sometime referred to as ââ¬Å"crackingâ⬠the gate. ) 1. 4. 6 REFERENCES ON PENSTOCK INTAKES: â⬠¢ 1. 4. 7 Indian Standard Cited. IS 9761: Hydropower Intakes ââ¬â Criteria for Hydraulic Design OTHER REFERENCES â⬠¢ Guidelines for Design of Intakes for Hydroelectric Plants ASCE, New York (1995) â⬠¢ Validating the Design of an Intake Structure : By Narasimham Raghavan and M. K. Ram achandran, HRW ââ¬â September 2007. â⬠¢ Laymanââ¬â¢s Guidebook European Small Hydro Association Brussels, Belgium (June 1998)Available on the internet. â⬠¢ Vortices at Intakes By J. L. Gordon Water Power & Dam Construction April 1970 1. 5. TRASHRACKS AND SAFETY RACKS 1. 5. 1 Trashracks: Trashracks at penstock intakes for small hydro plants should be sloped at 4 V: 1H to facilitate manual raking and the approach velocity to the trashracks limited to 1. 0 m/s or less. Use of rectangular bars is normal practice for SHPââ¬â¢s. Support beams should be alignment with the flow direction to minimize hydraulic losses. Detailed trashrack design should be done in accordance with IS 11388. 1. 5. 2Safety Racks: Safety racks are required at tunnel and inverted siphon entries to prevent animals or people who may have fallen into the canal from being pulled into these submerged water ways. A clear spacing of 200 mm between bars is recommended. Other aspects of design should be in accordance with IS 11388. 1. 5. 3 References on Trashracks IS11388 ââ¬â ââ¬Å"Recommendations for Design of Trashracks for Intakesâ⬠. ASCE (1995) ââ¬âââ¬Å"Guidelines for Design of Intakes for Hydroelectric Plantsâ⬠. AHEC/MNRE/SHP Standards/ Civil Works ââ¬â Guidelines For Hydraulic Design Of Small Hydro Plants /May 2011à à 20 DRAWINGS:AHEC/MNRE/SHP Standards/ Civil Works ââ¬â Guidelines For Hydraulic Design Of Small Hydro Plants /May 2011à à 21 AHEC/MNRE/SHP Standards/ Civil Works ââ¬â Guidelines For Hydraulic Design Of Small Hydro Plants /May 2011à à 22 2. HYDRAULIC DESIGN OF WATERWAYS The waterways or water conduction system is the system of canals, aqueducts, tunnels, inverted siphons and pipelines connecting the head works with the forebay tank. This Section provides guidelines and norms for the hydraulic design of these structures. 2. 1 2. 1. 1 CANALS Canals for small hydro plants are typically constructed in masonry or reinforced co ncrete.Several typical cross section designs are shown below: AHEC/MNRE/SHP Standards/ Civil Works ââ¬â Guidelines For Hydraulic Design Of Small Hydro Plants /May 2011à à 23 Lined canals in earth, if required, should be designed in accordance with Indian Standard: IS 10430. A further division of canal types is based on function: ââ¬â Feeder canal to connect the head regulator (intake) to the desilter ââ¬â Power canal to connect the desilter to the Forebay tank. 2. 1. 2 Feeder Canals 2. 1. 2. 1 Feeder canal hydraulic design shall be based on the following criteria: = Turbine flow (QT) + Desilter flushing flow (QF).Design flow (Qd) AHEC/MNRE/SHP Standards/ Civil Works ââ¬â Guidelines For Hydraulic Design Of Small Hydro Plants /May 2011à à 24 2. 1. 2. 2 Scouring velocity: A sufficiently high velocity must be provided to prevent deposition of sediment within the canal. This (scouring) velocity can be determined from the following formulae: d 9/7 S C = 0. 66 6 / 7 n = 0. 015 q 1 1 ? VS = . R 2 / 3 . S C/ 2 n Where: Sc = Scouring slope d = Target sediment size (m) q = Flow per unit width (Q/W) (m/s/m) R = hydraulic radius (m) Vs = scouring velocity (m/s) n = Manningââ¬â¢s roughness coefficient 2. 1. 2. 3 Optimization:The optimum cross section dimensions, slope and velocity should be determined by economic analysis so as to minimize the total life time costs of capital, O&M and head losses (as capitalized value). The economic parameters for this analysis should be chosen in consultation with the appropriate regional, state or central power authorities these parameters include: ââ¬â Discount rate (i) ââ¬â Escalation rate(e) ââ¬â Plant load factor ââ¬â Service life in years (n) ââ¬â Annual O+M for canal (% of capital cost) ââ¬â Value of energy losses (Rs/kWh). Also see Section 1. 7 of this Standard. The selected design would be based on the highest of Vs or Voptimum. . 1. 2. 4 Freeboard: A freeboard allowance above the steady state design water level is required to contain water safely within the canal in event of power outages or floods. A minimum of 0. 5 m is recommended. 2. 1. 3 Power Canals: Power canal design shall be based on the following criteria a) Design flow = total turbine flow (QT) b) Power canal design should be based on optimization of dimensions, slope and velocity, as explained in the previous section. For mini-hydro plants Q < 2. 0 m3/s optimal geometric design dimensions for Type 1 (masonry construction) can be estimated by assuming a longitudinal slope of 0. 04 and a Manningââ¬â¢s n value of 0. 018. Masonry construction would normally be preferred for canals with widths (W) less than 2. 0 m (flow area = AHEC/MNRE/SHP Standards/ Civil Works ââ¬â Guidelines For Hydraulic Design Of Small Hydro Plants /May 2011à à 25 2. 0 m2). For larger canals with flow areas greater than 2. 0m2, a Type 3, box culvert design would be preferred ââ¬â based on economic analysis. c) Fr eeboard: A freeboard allowance above the steady state design level is required to contain water safety within the canal in event of power outages. The waterway in most SHPââ¬â¢s terminates in a Forebay tank.This tank is normally equipped with an escape weir to discharge surplus water or an escape weir is provided near to the forebay tank. For mini-hydro plants a minimum freeboard of 0. 50 m is recommended. The adequacy of the above minimum freeboard should be verified for the following conditions: â⬠¢ Maximum flow in the power canal co-incident with sudden outage of the plant. â⬠¢ Design flow plus margins for leakage losses (+0. 02 to +0. 05 QT) and above rated operation (+ 0. 1QT). â⬠¢ Characteristics of head regulator flow control. The freeboard allowance may be reduced to 0. 5 m after taking these factors into consideration. The maximum water level occurring in the forebay tank can be determined from the weir equation governing flow in the escape weir. 2. 1. 4 Reje ction Surge Designs which do not incorporate downstream escape weirs would be subject to the occurrence of a rejection surge in the canal on sudden turbine shutdown, giving above static water levels at the downstream end, reducing to the static level at the upstream (entry) end of the water way. Methods for evaluating water level changes due to a rejection surge are explained in Section 2. 2. 2 / 7. 0 of this Standard. . 2 AQUEDUCTS Aqueducts are typically required where feeder or power canals pass over a gully or side stream valley. If the length of the aqueduct is relatively short the same channel dimensions as for the canal can be retained and there would be no change in hydraulic design. For longer aqueducts design would be based on economic analysis subject to the proviso that flow remains sub critical with NF ? 0. 8 in the flume sections. The following sketch shows the principal dimension of aqueduct entry and exit transitions and flume section. AHEC/MNRE/SHP Standards/ Civil Works ââ¬â Guidelines For Hydraulic Design OfSmall Hydro Plants /May 2011à à 26 The changes in invert elevation across the entry and exit structures can be calculated by Bernouliââ¬â¢s equation as below: â⬠¢ Entry transition ââ¬â consider cross ââ¬â section (1) and (2); V2 V2 Z 1 + D + 1 = Z 2 + d + 2 + hL 2g 2g and 2 â⬠¢ b? V ? hL = 0. 10 ? 1 ? ?. 2 ? B ? 2g Z2 can be determined from the above equations, since all geometrical parameters are known. Flume ââ¬â Sections (2) to (3) The slope of the flume section is determined from Manningââ¬â¢s equation 2 â⬠¢ ? Vn ? ( S ) = ? 2 / 3 ? . A Manningââ¬â¢s n = 0. 018 is suggested for concrete channels. ?R ?Some designers increase this slope by 10% to provide a margin of safety on flow capacity of the flume. Exit transition ââ¬â consider cross section (3) and (4): V2 V2 Z 3 + d + 3 = Z 4 + D + 4 + hL 2g 2g AHEC/MNRE/SHP Standards/ Civil Works ââ¬â Guidelines For Hydraulic Design Of Small Hydro Plants /May 2011à à 27 and 2 b? V ? hL = 0. 20 ? 1 ? ?. 3 ? B ? 2g Z4 can be determined from the above equations, since all geometrical parameters are known. The same basic geometry can be adapted for transition between trapezoidal canals sections and rectangular flume section, using mean flow width (B) = A/D. . 3. INVERTED SYPHONS 2. 3. 1 Inverted syphons are used where it is more economical to route the waterway underneath an obstacle. The inverted syphon is made up of the following components: â⬠¢ Entry structure â⬠¢ Syphon barrels â⬠¢ Exit structure â⬠¢ Entry Structure: Hydraulic design of the entry structure is similar to the design of reservoir, canal and penstock intakes. Follow the guidelines given in Section 2. 2. 2/2. of this Standard. â⬠¢ Syphon barrels: The syphon barrel dimensions are normally determined by optimization ? V? ? does not tudies, with the proviso that the Froude Number ? N F = ? gd ? ? ? exceed 0. 8. Invert elevations are determine d by accounting for head losses from entry to exit of the structure using Bernouliââ¬â¢s equation. For reinforced concrete channels a Manningââ¬â¢s ââ¬Å"nâ⬠value of 0. 018 is recommended. The head loss coefficients for mitre bends can be determined from USACE HDC 228. 2. AHEC/MNRE/SHP Standards/ Civil Works ââ¬â Guidelines For Hydraulic Design Of Small Hydro Plants /May 2011à à 28 AHEC/MNRE/SHP Standards/ Civil Works ââ¬â Guidelines For Hydraulic Design Of Small Hydro Plants /May 2011à à 29 Exit structure: The exit structure is designed as a diverging transition to minimize head losses; the design is similar to the outlet transition from flume to canal as discussed in Subsection 2. 2. 2/2 of this Standard. The following sketches show the layout of a typical inverted siphon. AHEC/MNRE/SHP Standards/ Civil Works ââ¬â Guidelines For Hydraulic Design Of Small Hydro Plants /May 2011à à 30 2. 3. 2 Reference on Aqueducts and Inverted Syphons ââ¬Å"Hyd raulic Structuresâ⬠By C. D. Smith University of Saskatchewan Saskatoon (SK) Canada 2. 4. LOW PRESSURE PIPELINESLow pressure pipelines may be employed as an alternative to pressurized box culverts, aqueducts or inverted syphons. Concrete, plastic and steel pipes are suitable depending on site conditions and economics. Steel pipe is often an attractive alternative in place of concrete aqueducts in the form of pipe bridges, since relatively large diameter pipe possesses significant inherent structural strength. Steel pipe (with stiffening rings, as necessary), concrete and plastic pipe also have significant resistance against external pressure, if buried, and offer alternatives to inverted syphons of reinforced concrete construction.Generally pressurized flow is preferred. The pipe profile should be chosen so that pressure is positive through out. If there is a high point in the line that could trap air on filling an air bleeder valve should be provided. Otherwise, hydraulic desi gn for low pressure pipelines is similar to the requirements for inverted syphons. The choice of type of design; low pressure pipeline land pipeline material), inverted syphon or aqueduct, depends on economic and constructability considerations, in the context of a given SHP. Manningââ¬â¢s ââ¬Å"nâ⬠Values for selected Pipe Materials Material Welded Steel Polyethylene (HDPE) Poly Vinyl Chloride (PVC)Asbestos Cement Cast iron Ductile iron Precast concrete pipe Manningââ¬â¢s ââ¬Å"nâ⬠0. 012 0. 009 0. 009 0. 011 0. 014 0. 015 0. 013(2) Note: (1) From Table 5. 4 Laymanââ¬â¢s Guide Book ââ¬â ESHA (2) From Ven T. Chow ââ¬â Open Channel Hydraulics AHEC/MNRE/SHP Standards/ Civil Works ââ¬â Guidelines For Hydraulic Design Of Small Hydro Plants /May 2011à à 31 2. 5. TUNNELS 2. 5. 1 Tunnels often provide an appropriate solution for water conveyance in mountainous areas. Tunnels for SHP are generally of two types. â⬠¢ Unlined tunnels â⬠¢ Concrete li ned tunnels On SHP tunnels are usually used as part of the water ways system and not subject to high pressures. . 5. 2 Unlined tunnels: Unlined water tunnels can be used in areas of favourable geology where the following criteria are satisfied: a) Rock mass is adequately water tight. Rock surfaces are sound and not vulnerable to erosion (or erodible zones b) are suitably protected. The static water pressure does not exceed the magnitude of the minor field c) rock stress. Controlled perimeter blasting is recommended in order to minimize over break and produce sound rock surfaces. Additionally, this construction approach tends to produce relatively uniform surfaces and minimizes the hydraulic roughness of the completed tunnel surfaces.Design velocities of 1. 5 to 2. 0 m/s on the mean AHEC/MNRE/SHP Standards/ Civil Works ââ¬â Guidelines For Hydraulic Design Of Small Hydro Plants /May 2011à à 32 cross section area give optimal cross section design. It is normal practice to provi de a 100mm thick reinforced concrete pavement over leveled and compacted tunnel muck in the invent of the tunnel. IS 4880: Part 3 provides additional guidance on the hydraulic design of tunnels and on the selection of appropriate Manningââ¬â¢s ââ¬Å"nâ⬠values. 2. 5. 3 Lined Tunnels Where geological are unfavourable it is often necessary to provide concrete linings for support of rock surfaces.IS4880: Parts 1-7 give comprehensive guidelines on the design of lined tunnels. 2. 5. 4 High Pressure Tunnels Design of high pressure tunnels is not covered in this standard. For high pressure design, if required, the designer should consult an experienced geotechnical engineer or engineering geologist. For the purpose of this standard, high pressure design is defined as tunnels subject to water pressures in excess of 10m relative to the crown of the tunnels. 2. 5. 5 Reference on Tunnels IS Standards: IS 4880 ââ¬Å"Code of Practice for the Design of Tunnels Conveying Waterâ⬠. Ot her References: Norwegian Hydropower Tunnellingâ⬠(Third volume of collected papers) Norwegian Tunneling Society Trondheim, Norway. www. tunnel. no Notably: Development of Unlined Pressure Shafts and Tunnels in Norway, by Einar Broch. 2. 6. CULVERTS AND CROSS-DRAINAGE WORKS Small hydro projects constructed in hilly areas usually include a lengthy power canal routed along a hillside contour. Lateral inflows from streams and gullies intercepted by SHP canals often transport large sediments loads which must be prevented from entering the canal. The first line of defense is the canal upstream ditch which intercepts local lateral runoff.The flow in these chains must be periodically discharged or the drain capacity will be exceeded. Flow from these drains is usually evacuated via culverts passing underneath the canal. These culverts would normally be located where gullies or streams cross the canal alignment. The capacity of canal ditches should be decided taking into consideration t he average distance between culverts. In the rare cases when distance between culverts is excessive, consideration should be given to diverting AHEC/MNRE/SHP Standards/ Civil Works ââ¬â Guidelines For Hydraulic Design Of Small Hydro Plants /May 2011à à 33 itch flows across the canal in flumes or half round pipes to discharge over the downhill side of the canal at suitable locations. Culverts are usually required where the canal route crosses gullies or streams. Culverts at these points provide for flow separation between lateral inflows and canal inflows and often present the most economical solution for crossing small but steep valley locations. It is recommended that culverts design be based on the following hydrological criteria. â⬠¢ For mini hydro projects, 1 in 10 year flood (Q10) â⬠¢ For small hydro projects, 1 in 25 year flood (Q25)Where it is practical to extract the necessary basin parameters, the procedures given in Section 1. 4 should be applied. Otherwise design flows should be estimated from field measurements of cross section area and longitudinal slope at representative cross section of the gully or side stream. A survivable design approach is further recommended with canal walls strengthened to allow local over topping without damage to the canal integrity when floods exceed the design flood values. Detailed hydraulic design should be based on information from reliable texts or design guidelines ââ¬â such as: ââ¬Å"Design of Small Bridges and Culvertsâ⬠Goverdhanlal â⬠¢ â⬠¢ 2. 7 2. 7. 1 ââ¬Å"Engineering and Design ââ¬â Drainage and Erosion Controlâ⬠. Engineering Manual EM 1110-3-136 U. S. Army Corps of Engineers (1984) www. usace. army. mil/publications/eng-manuals Manufacturerââ¬â¢s guides, notably: ââ¬â American Concrete Pipe Association www. concrete-pipe. org ââ¬â Corrugated Steel Pipe Institute www. cspi. ca Power Canal Surges Power canals that are not provided with escape weirs near their downstream end will be subject to canal surges on rapid load rejections or load additions.The rejection surge will typically cause the downstream water level to rise above static level and may control the design of canal freeboard. For load additions there is a risk that the level will fall to critical at the downstream end and restrict the rate at which load can be taken on by the unit. The following formulae taken from IS 7916: 1992 can be used to estimate the magnitude of canal surges. AHEC/MNRE/SHP Standards/ Civil Works ââ¬â Guidelines For Hydraulic Design Of Small Hydro Plants /May 2011à à 34 Maximum surge height in a power channel due to load rejection may be calculated from the empirical formulae given below:For abrupt closure hmax = K 2 + 2 Kh For gradual closure within the period required for the first wave to travel twice the length of the channel: K hmax = + V . h / g 2 Where: hmax = maximum surge wave height, K = V2/2g = velocity head, V = mean velocity of flow, and area of cross sec tion h = effective depth = top width â⬠¢ Maximum water level resulting from a rejection surge at the downstream of a canal: Maximum W. L. = Yo + hmax â⬠¢ Minimum water level resulting from by a start up surge at the downstream end of a canal: Minimum W. L. = YS ââ¬â hmax Where: Yo YS = steady state downstream water level static downstream water level. The maximum water level profile can be approximated by a straight line joining the maximum downstream water level to the reservoir level. 2. 7. 2 Canal Surges on Complex Waterways: For waterway systems comprising several different water conductor types, the above equations are not applicable. In such cases a more detailed type of analysis will be required. The U. S. National Weather Service FLDWAV computer program can be used to solved for the transient flow conditions in such cases (Helwig, 2002). 2. 7. 3 References IS Standards cited:IS 7916: 1992 ââ¬Å"Open Channel ââ¬â Code of Practiceà ¢â¬ . Other References ââ¬Å"Application of FLDWAV(Floodwave) Computer Model to Solve for Power Canal Rejection Wave for Simple and Complex Casesâ⬠. P. C. Helwig Canadian Society for Civil Engineering Proceedings, Annual Conference Montreal, Canada (2002). AHEC/MNRE/SHP Standards/ Civil Works ââ¬â Guidelines For Hydraulic Design Of Small Hydro Plants /May 2011à à 35 3. HYDRAULIC DESIGN OF DESILTERS 3. 1 BACKGROUND Sediment transported in the flow, especially particles of hard materials such as quartz, can be harmful to turbine components.The severity of damage to equipment is a function of several variables, notably: sediment size, sediment hardness, particle shape, sediment concentration and plant head. The control of turbine wear problems due to silt erosion requires a comprehensive design approach in which sediment properties, turbine mechanical and hydraulic design, material selection and features to facilitate equipment maintenance are all considered (Naidu, 200 4). Accordingly the design parameters for desilter design should be made in consultation with the mechanical designers and turbine manufacturer.Where the risk of damage is judged to be high a settling basin (or desilter) should be constructed in the plant waterway to remove particles, greater than a selected target size. 3. 1. 1 Need The first design decision is to determine whether the sediment load in the river of interest is sufficiently high to merit construction of a desilter. There is little guidance available on this topic; however, the following limits are suggested by Naidu (2004): Table 2. 2. 3/1. 0 Concentration Suggested Maximum Allowable Sediment versus Plant Head. Parameter Head Maximum allowable sediment concentrationLow and Medium Head Turbines ? 150 m High Head Turbines > 150 m 200 ppm 150 ppm 3. 1. 2 Removal Size There are also considerable divergences of opinion on the selection of design size for sediment removal. Nozaki (1985) suggests a size range of between 0. 3 mm to 0. 6 mm for plant heads ranging from 100 m to 300 m. Indian practice is to design for a particles size of 0. 20 m regardless of head. Some authors suggest that removal of particles smaller than 0. 20 mm is not practical. The adoption of 0. 20 mm is the design (target) sediment size is recommended for Indian SHP designs.AHEC/MNRE/SHP Standards/ Civil Works ââ¬â Guidelines For Hydraulic Design Of Small Hydro Plants /May 2011à à 36 3. 1. 3 Types of Desilters There are two basic types of desilters: Continuous flushing type Intermittent flushing type Guidelines for design of both types are given in this section. 3. 2. DESIGN CONSIDERATIONS 3. 2. 1 Data Requirements (Small Hydro Plants) It is recommended that a program of suspended sediment sampling be initiated near the intake site from an early stage during site investigations to ensure that sufficient data is available for design.The sampling program should extend through the entire rainy season and should comprise at least two readings daily. On glacier fed rivers where diurnal flow variations may exist, the schedule of sampling should be adjusted to take this phenomenon into account and the scheduled sampling times be adjusted to coincide with the hour of peak daily flow with another sample taken about twelve hours later. While it is often assumed that sediment load is directly related to flow, this is only true on the average, in a statistical sense.In fact it is quite likely, that the peak sediment event of a year may be associated with a unique upstream event such as a major landslide into the river. Such events often account for a disproportionately large proportion of the annual sediment flow. Therefore, it would also be desirable to design the sediment measurement program to provide more detailed information about such events, basically to increase the sampling frequency to one sample per 1 or 2 hours at these times. A five year long sediment collecting program would be ideal. Less than o ne monsoon season of data is considered unsatisfactory.Some authors suggest that the vertical variation of sediment concentration and variations horizontally across the river be measured. However, on fast flowing rivers inherent turbulence should ensure uniform mixing and sampling at one representative point should be sufficient. The data collected in a sediment sampling program should include: â⬠¢ Mean daily concentration of suspended sediment (average of two readings twelve hours apart) â⬠¢ Water temperature â⬠¢ Flow (from a related flow gauging program) The following additional information can then be derived from collected samples.AHEC/MNRE/SHP Standards/ Civil Works ââ¬â Guidelines For Hydraulic Design Of Small Hydro Plants /May 2011à à 37 â⬠¢ â⬠¢ â⬠¢ A sediment rating curve (sediment concentration versus flow ââ¬â where possible) Particle size gradation curve on combined sample Specific gravity of particles. It is also recommended that a pet rographic analysis be carried out to identify the component minerals of the sediment mix. It is likewise recommended that experiments be made on selected ranges of particles sizes to determine settling velocities. A further discussion on the subject of sediment sampling is given in Avery (1989)The characteristics of the sediment on a given river as obtained from a data collection program will assist in selection of appropriate design criteria. 3. 2. 2 Data Requirements (Mini Hydro Plants) On mini hydro projects where resources and time may not be available to undertake a comprehensive sampling program, selection of design parameters will depend to a great extent on engineering judgment, supplemented by observations on site and local information. The following regional formula by Garde and Kothyari (1985) can be used to support engineering decision making. 0. 19 ?P ? 0 Vs = 530. 0 P0. 6. Fe1. . S0. 25 Dd . 10 .? max ? ?P? Where Vs = mean sediment load in (tonnes/km2/year) s = average slope (m/m) Dd = drainage density, as total length of streams divided by catchment area (km/km2) P = mean annual precipitation (cm) Pmax = average precipitation for wettest month (cm) Fe = ground cover factor, as below: 1 Fe = [0. 80 AA + 0. 60 AG + 0. 30 AF + 0. 10 AW ] ? Ai = arable land area AA = grass land area (all in km2) AG AF = forested area AW = waste land area (bare rock) 3. 2. 3 Design Criteria The principle design criteria are: 1. The target size for removal (d): d = 0. 20 mm is recommended 2.Flushing flow: QF = 0. 2 QP is recommended 3. Total (design) flow: QT = QP + QF = 1. 2 QP. Where QP is plant flow capacity in (m3/s). AHEC/MNRE/SHP Standards/ Civil Works ââ¬â Guidelines For Hydraulic Design Of Small Hydro Plants /May 2011à à 38 3. 2. 4 Siting The following factors control site selection 1. A site along the water way of appropriate size and relatively level with respect to cross section topography 2. A site high enough above river level to provide adequate head for flushing. For preliminary layout a reference river level corresponding to the mean annual flood and minimum flushing head of 1. 0 m is recommended. In principle a desilting tank can be located anywhere along the water conductor system, upstream of the penstock intake. Sometimes it is convenient to locate the desilting basin at the downstream end of the waterway system where the desilter can also provide the functions of a forebay tank. However, a location as close to the head works is normally preferred, site topography permitting. 3. 3 Hydraulic Design A desilter is made up of the following elements: â⬠¢ Inlet section Settling tank â⬠¢ Outlet section â⬠¢ â⬠¢ Flushing system 3. 3. 1
Friday, August 30, 2019
Intro To Exercise Science Notes
Movement of the body Adaptations to movement How has EXECS evolved? Role of Pays DE Harvard Fatigue Laboratory Krause-Weber test results Professional associations American College of Sports Medicine (CACM) Developed as a ââ¬Å"unique blend of physical education, medicine, and physiologyâ⬠Provides significant public outreach Works to shape public policy Disseminates scholarly research Broad-based coursework Anatomy and physiology Biological sciences Chemistry and biochemistry Human development and psychology Mathematics and statistics PhysicsNervous System Primary functions Control systems of the body Primary component ââ¬â neuron Responds to acute challenges of the body Important consideration in: Disease conditions (e. G. Cerebral palsy) Sport performance (e. G. Controlling movement) Afferent Nerves: send signals to the brain Efferent Nerves: send signals from brain to the organ/muscle Muscular System Primary function: Provide movement Primary component Types of muscle: S keletal Cardiac Smooth ââ¬â muscle fiber Hypertrophy: increase in size of muscle Atrophy: decrease in size of muscleSkeletal System Primary functions: Structural framework for the body Protects underlying organs and tissues Provides a lever system for movement Serves as a storage area for minerals Primary component ââ¬â minerals and cells bone Osteoporosis is a serious disease condition: bones get brittle/weak Estonian: when bones get soft Cardiovascular System Transporting oxygen, nutrients, hormones, electrolytes, and drugs Removing waste products from the body Primary component ââ¬â heart, blood vessels, and blood Urinary System Elimination of waste productsRegulation of fluid volume, electrolyte composition, and pH Primary component ââ¬â kidney Hypertension can be influenced by increasing the amount of fluid removed by the kidneys Endocrine System Regulation of physiologic function and systems of the body Primary components ââ¬â endocrine glands Development o f insulin resistance leads to a disease condition known as metabolic syndrome Go over the clustering of metabolic syndrome risk factors Exercise Physiology: Study of the functional and physiologic responses and adaptations that occur during and following physical activity and exercise.
Thursday, August 29, 2019
KFC in India Essay
1. Since its entry into India in 1995,KFC has been facing protests by cultural and economic activists and farmers. What are the reasons for these protests and do you think these reasons are justified? Exaplain. During the early 1990s, KFC set up their business at India and they were faced all kind of protests by cultural, economic activists and farmers (The Ecologist, 1995). On the year of 1995, KFC open the first outlet at Bangalore and KFC was among the first fast-food multinational to enter India. One of the case which KFC involved is the municipal food inspectors found that KFCââ¬â¢s ââ¬Å"hot&spicyâ⬠seasoning contained nearly three times more mono sodium glutamate (MSG, popularly known as ajinomoto, a flavor enhancing ingredient) than allowed by the Indian Prevention of Food Adulteration Act,1954 (IPFAA) (Ray, Ashis, 1995). According to the IPFAA , fast food restaurants can only contain maximum 1 percent of MSG as a seasoning of the food. Therefore, the KFCââ¬â¢s chicken being sent for food inspectorsââ¬â¢ examination, followed by laboratory tests and analysis. But after all the procedure, they found that KFCââ¬â¢s chicken had exceed the legal MSG limits which is con tained 2.8 percent of MSG. Due to this issue, KFC being chargedà because of ââ¬Å"adulterated, misbranded, and unfit for human consumption. (Ray, Ashis, 1995) After the protests faced at Bangalore, Pepsi Co opened a second KFC outlet in Delhi, the national capital, in October 1995 (Delhiââ¬â¢s Fried Chicken Blues,1995). Within couple of weeks of launch, KFC in Delhi had to stop its business as health officials canceled its license on November 1995 due to coating mix imported from United States contained sodium aluminium phosphate(SAP), which was hazardous to human health. Meanwhile, KFC was able to proved that SAP was used in small quantities in the baking powder and was not harmful. And the KFC had won the case and resumed back its business.(Delhiââ¬â¢s Fried Chicken Blues,1995) After all the protests had been settle down, the activist from Delhi against taking up another issues about the hygiene conditions of the restaurant. Due to an inspection by food inspectors found flies buzzing around the kitchen and garbage cans just outside the restaurant premises. Because of the issue, the Delhi KFC outlet was closed within 23 days of reop ening. From the cultural and economic activists and farmers perspective, KFC will also bring numerous disadvantage towards them if KFC start up their business at India. Nationalists also feared a culture invasion; environmentalists and farmers felt grain consumption by cattle for meat production would be detrimental; and nutritionists highlighted the consumption of fast food will increase the rate of obesity, hypertension ,heart disease , and cancer. Therefore, they were protest the entry of KFC into their country and they also carry ââ¬Å"boycott KFCâ⬠signs while protest. KFC had experience different kind of issue raised up by the cultural and economic activists and farmers, there are some cases where the KFC should research about India culture before they enter. Most of the protests cases was because of the healthy issues brings to the people after consume the KFCââ¬â¢s chicken (Protest against KFC,2004) Sometimes, many businesses too focus on profit making and did not concern on the consumerââ¬â¢s healthy. Therefore, KFC have to follow the legal requirement of the food in order to sustain their business in India. On the others hand, most of the farmersà protest is because they feared that the fast-food chain will affect its local agricultural environment (Narasimhan, Shakuntala,1996). All this is about ethical of business, KFC should not serve a food which is contained unhealthy ingredient and they must also concern more on the economy growth at India. 2. PETA has been protesting against KFC in India since the last 1990s. What are the reasons for PETAââ¬â¢s protests against KFC and how did KFCââ¬â¢s management react to them? Do you agree with PETA that KFC has been cruel toward the birds and hence it should leave India? Based on this case study, we found out that KFC in India faced severe protests by People for Ethical Treatment of Animals (PETA), an animal rights protection organization. The reason for PETAââ¬â¢s protest against KFC was primarily due to the inhumane treatment the chickens faced on KFC farms and released a video tape showing the ill-treatment of birds in KFCââ¬â¢s poultry farms. Pilgrimââ¬â¢s Pride (PP) is one of KFCââ¬â¢s award-winning supply operations and the second largest processor of chickens in the United States. PETAââ¬â¢s investigations in Pilgrimââ¬â¢s Pride poultry farm brought to light the inappropriate practices that prevailed in KFCââ¬â¢s supplier operations, Yamini Aparna K . Vivek Gupta (2004). In other word PETA found a video exposing KFC supplier abuse chickens by cruel trick and this immediately aroused public attention. In the 4 minute video released by PETA in regards to these allegations, viewers witnessed birds living in overcrowded, crammed warehouses with barely any space to move, vast amounts of chicken carcasses that had died from disease, dirty, injured chickens and the cruel actions towards the animals by the hands of the staff. Besides that, the staff do anything to abuse the chicken, they often cut off their wings, slamming them to the wall, punched them as sandbags, kicked them as football. At slaughter, the chickenââ¬â¢ throats are slit and dropped into tanks of scalding-hot water while they are still conscious.(refer to reference 11) They abuse the chickens alive to death and then gave to outlet frying as delicious fried chicken serve all around the world. Though other fast food organizations such as McDonaldââ¬â¢s and Burger King had already ââ¬Ëuppedââ¬â¢ their standards regarding the treatment of animals, KFC had yet to do so. In these factories and poultry farms, birds were kept in very unhygienic conditions and treated cruelly. However, undeterred byà the protests by PETA and other animal rights organizations, KFC planned a massive expansion program in India,Margaret Scheikowski (2009). According to ââ¬ËPETAââ¬â¢s Fact Sheet of KFCââ¬â¢s Crueltyââ¬â¢, there were six main points of suffering the chickens faced, Dan Mathews, PETA (July 12, 2011). These included; i. Having less than a normal sized piece of paper to live in -This is where the chickens are stuffed by tens of thousands into overcrowded sheds where they hardly find space to move freely. To save space and avoid chicken hurting each other, the sensitive chicken beaks are cut off with hot blade without giving any pain killers. Overcrowding and poor litter quality in the farms also caused painful ammonia burns on the chickens. The injured chickens received no treatment and had to bear the pain throughout their life. ii. Suffering from crippled and deformed legs since birth and dying early from heart attacks as a result of poor breeding methods ââ¬â Birds are fed genetically modified feed in order to accelerate their growth rate. As a result they suffer from ailments such as extreme obesity and fatty livers and kidneys, heart attacks and other problems. iii. Being killed before reaching six weeks of age -This is where the chickens are slaughtered before they are 6 weeks old. At the slaughter house, chickens are hung upside down and transferred through conveyor belts to the killing room fully conscious. iv. Frustrated Workers ââ¬â Due to poor wages and working conditions, employees used the chickens as a means to vent frustrations and alleviate boredom. They twisted the birdââ¬â¢s heads off, spat tobacco into their eyes and mouths, spray-painted their faces, used them as footballs and squeezed their bodies so hard that the birds expelled feces. v. Mistreatment by callous staff and; vi. Receiving little to no veterinary care KFCââ¬â¢s management in response to PETAââ¬â¢s protest was adding more outlets andà the announcement of major developments to the program. They also planned to open more stores in prime locations such as shopping malls in cosmopolitan areas. Vegetarian dishes were also implemented into the menu to cater and attract the mass vegetarian population. However, PETA India wrote a letter to the Managing Director of Tricon Restaurant International, the parent company of KFC, asking them to close their sole KFC outlet in India. But their responses are got no reply. So that, PETA activists decided to protest against KFC by carrying crippled chicken, which represented the birds suffering in the KFCââ¬â¢s farms. PETA claimed that after two years of intensive campaigning to increase animal welfare standards in poultry farms. After analyzing the case study and PETAââ¬â¢s fact sheet, it is clear that KFC are cruel towards their birds and hence should leave India. Moreover, as KFC is s uch a powerful multinational company and with support from the director of marketing of Yum! Restaurants International who assured KFC followed the welfare guidelines and valued Indian law, this outcome was highly unlikely. 3. What is the importance of ethics in doing business? Do you think in the face of fierce competition, business organizations are justified not to support ethical values at the cost of making profits? Why or why not? Justify your answer giving examples. There is no doubt that business ethics plays a more and more important role in modern economy. Ethics can be associated with being fair, honest, and moral and being ââ¬Ëthe right thing to doââ¬â¢. There are many essential benefits to those businesses known for good ethical values (Steven Symes, July 2014). One of the responsibilities of an organization is to make sure that all their actions to the ethical standards provided by the law, the KFC need to follow the rule and regulation at the country. Other than strategy for marketing and management, businesses have considered other elements that play significant roles towards success. One of these important elements is ethics. These organizations tend to be those that attain higher quality staff, staff turnover is low, better image, attract and maintain new and existing consumers and have a greater competitive advantage. Though many businesses try and aim to be both ethical and successful, countless believe it to get in the way of making a profit (VoiceLee1 , October 2013). Depending on which country and state you are in can determine the amount of trouble a company may face with their unethicalà behavior. In extreme cases this may lead to the law being involved which principally takes profits away from businesses and to operate in certain markets, Consumer international (2008). Based on the case study of KFC in India, being a large international company immediately draws attention. Even though domestic businesses in India may not follow the ââ¬Ërightââ¬â¢ ethical procedures, KFC is automatically under the spotlight as locals expect them to follow international standards. In the face of fierce competition, business organizations should have support ethical values whether they believe it will affect their profits or not. For any organization, ââ¬Ëthe customer is always rightââ¬â¢ and are one of the most important factor in keeping the business alive as this is where profits are made. As customers have ethics, if they are not happy, no profits. Laura Costa, Ph.D. (December, 2012) It is highly essential for business organizations to understand the importance of ethics in todayââ¬â¢s world. In order to achieve this, large international companies such as KFC who are expanding their businesses in less develop countries such as India, need to gain understanding of the country culture, regulatory and ecological issues. So that, KFC should work together and partner up with local farmers as well as with their consumers to ensure them they have quality products. Another strategy may also be to implement a farm level guideline and analysis reports for their stakeholders regarding poultry care and handling. Ronald D Francis&Mukti Mishra(2014),pg 56-60. 4. CONCLUSION Finally, we can understand from the case that every business organization should understand the importance of ethics by understanding the culture, regulatory and ecological issues in different countries. KFC should implement a farm level guideline & audit program ââ¬â a program which is industry leading in the areas of poultry care and handling, mainly for their supplier in the broiler industry. Therefore the company need some common principles to guide the behaviors. It is much easier for a company with good moral conducts to build its reputation and win respect from all aspects of a society. KFC has been already gained the reputation of a fast food that continuously provides greasy unhealthy food, so it needs to do something about and shift its positive image back. Reference 1. Yamini Aparna K. Vivek Gupta(2004) KFC in India: Ethical Issues [Online] Available from: http://www.asiacase.com/ecatalog/NO_FILTERS/page-CROSSMGT-649128.html[Accessed :17th July 2014] 2. Margaret Scheikowski (2009) Family sues KFC over ââ¬Å"food Poisoningâ⬠. [Online] Available from: http://news.ninemsn.com.au/national/845258/kfc-sued-over-salmonella-poisoning[Accessed :17th July 2014] 3. Dan Mathews ,PETA(July 12, 2011). KFC in India Available from: http://www.kentuckyfriedcruelty.com/index.asp[Accessed :18th July 2014] 4. Schreiner, Bruce (23 July 2005). ââ¬Å"KFC still guards Colonelââ¬â¢s secretâ⬠. Associated Press. Retrieved 19 September 2013. Available from: http://jacksonville.com/tu-online/stories/072305/bus_19314459.shtml[Accessed :19th July 2014] 5. VoiceLee1 , October 2013ââ¬â¢KFC in India Case Study Assignment (Ethical Issue) Available :19th July 2014] 6. Consumer international (2008) WCRD 2008 [Online] Available from: http: //www.consumersinternatio nal.org/Templates/Internal.asp?NodeID= 97050 &int1stParentNodeID=89647&int2ndParentNodeID=95043[Accessed :19th July 2014] 7. Laura Costa, Ph.D. (December,2012) Protect You from Harmful Chemicals in Cosmetics and Household Products. [Online] Available from: http://loveyourbody.nowfoundation.org/harmful_chemicals.html[Accessed :20th July 2014] 8. KENTUCKY FRIED CHICKEN (KFC) IN INDIA(No date) [Online] Available fromhttp://www.freeessays123.com/essay21631/kentuckyfriedchickenkfcinindia.html[Accessed :20th July 2014] 9. Ronald D Francis&Mukti Mishra(2014),pg 56-60â⬠Business Ethicalâ⬠Available from: http://books.google.com.my/books?id=xV8l8EUCOjQC&pg=PA176&lpg=PA176&dq=www.icmrindia.org/casestudies/â⬠¦/business%2520ethics/BECG044.+HTML&source=bl&ots=wKboQnsm4A&sig=4Cd0mvIFlBRz-LMhNMOzZVsx1L8&hl=en&sa=X&ei=jO7LU8z7HIq9ugTB0ILACw&ved=0CC4Q6AEwAg#v=onepage&q=www.icmrindia.org%2Fcasestudies%2Fâ⬠¦%2Fbusiness%2520ethics%2FBECG044.%20HTML&f=false[Accessed :20th July 2014] 10. Steven Symes (July 2014), ââ¬ËImportance of Ethical Conduct in a Business. Available from: http://smallbusiness.chron.com/importance-ethical-conduct-business-25163.html[Accessed :20th July 2014] 11. video released by PETA http://www.youtube.com/watch?v=qXKExmm_Mk0 or http://www.youtube.com/watch?v=2zLZrAQ8JIM or http://www.youtube.com/watch?v=e5eMQ-3Drmw 12. Ray, Ashis. â⬠KFC Takes On India over MSG,â⬠www.cnn.com, September 21, 1995 13. ââ¬Å"Delhiââ¬â¢s Fried Chicken Blues,â⬠www.theasiaweek.com, November 24, 1995 14. ââ¬Å"Kentucky Fried Chicken Protest in India.â⬠The Ecologist, November/ December 1995 15. Narasimhan, Shakuntala. ââ¬Å"Tandoori vs Kentucky Fried.â⬠Multinational Monitor, January/ February 1996 16. ââ¬Å"Protest against KFC,â⬠www.hindu.com, February 18, 2004
New Media Essay Example | Topics and Well Written Essays - 1500 words
New Media - Essay Example Its examples are the Internet, websites, DVDs, CD-ROMs, vide-games, and computer multimedia. These new media technologies have not only become a necessary part of our daily lives but also have dramatically changed our way of living, affecting almost all aspects of our lives in various ways. As new media technologies have become increasingly the ordinary way by which we transact our daily businesses, its positive impact cannot be denied. In the first place, if the new media has not been beneficial to the lives of individuals and the society as a whole, it would have not been widely used and would have not become as pervasive as it is today. However, against its beneficial effects is its negative impact of what many critics termed as the digital divide, which various definitions (OECD, 2001; Boyd, 2002; Wolff & MacKinnon, 2002; Hilbert, 2011) can be summarized as the disproportionate distribution of new media technologies in terms of access, capability, and usage. Just like the undeniable beneficial impacts of new media technologies, so is the digital divide as statistics show. According to the Digital Divide Network (2002), more or less 429 million online users worldwide actually correspond to only 6% of the entire world population. The small proportion of online users is true even in highly developed countries (Sweden at 61% and Spain at 20%), meaning there exists a digital divide even in highly industrialized countries. But this becomes far greater when access and usage are compared between the ââ¬Å"haveâ⬠and the ââ¬Å"have notâ⬠countries ââ¬â the International Labor Organization (2001) reports that industrialized countries account for 90% of online users worldwide, with the United States and Canada leading both at 57%. On the contrary, the combined online users of Africa and the Middle East account for only 1% of global online users (as cited in Boyd, 2002, p. 113) The emergence of the digital divide, as can be gleaned from
Wednesday, August 28, 2019
Individual Marketing Strategy Report Essay Example | Topics and Well Written Essays - 3000 words
Individual Marketing Strategy Report - Essay Example To combat this growing consumer discontent with Appleââ¬â¢s iPhone, it is recommended that Apple redesign its promotional strategies to include lifestyle-relevant celebrity endorsers, change its current pricing structure, and emphasise more on the tangible product benefits as part of the marketing mix to regain competitive advantages and revenue growth. Apple must first, however, identify the psychological and sociological characteristics of its primary profitable market segment, the Achiever group, to accomplish gains in restoring the brandââ¬â¢s reputation. TABLE OF CONTENTS 1.0 Introduction................................................................................................................ 2.0 Situational analysis..................................................................................................... 2.1 PEST analysis................................................................................................. 2.2 SWOT analysis..................... .......................................................................... 3.0 Differential advantage................................................................................................. ... ..... 5.2 Marketing strategies and programmes............................................................. 6.0 Conclusion.................................................................................................................... References 1.0 Introduction Research in Motion (RIM), now appropriately renamed as Blackberry, had dominated the mobile phone market between 2000 and 2005, being an innovator and pioneer in a product category that was in its technological infancy and introductory period along the product life cycle. With the release of RIMââ¬â¢s Blackberry 957, one of the worldââ¬â¢s first smartphones, Research in Motion was able to define the product category and gain first mover advantages, something achievable through technology leadership and the ability to corner the market in a specific product category (Agarwal and Gort 2001). Up until 2006, when Research in Motion launched its Blackberry Pearl 8100 (the first smartphone with camera capabilities and othe r functional features found on todayââ¬â¢s smartphones), RIM was considered to be the foremost expert in mobile telephony virtually untouchable by potential new market entrants for its technological leadership. However, Apple Inc. developed its first version of the Apple iPhone, a revolutionary mobile telephone technology that encompassed multi-functional features and benefits ranging from streaming video capabilities to Internet Wi-Fi connectivity capacity. The innovative features included in the first and subsequent versions of the Apple iPhone quickly seized market share from the previous market leader, Research in Motion, rapidly building market segment loyalty for Apple. Subsequent versions of the iPhone were released yearly following 2007, which now include the Apple iPhone 5 that was just
Tuesday, August 27, 2019
Contemporary Management Essay Example | Topics and Well Written Essays - 2000 words
Contemporary Management - Essay Example In this study, we will tackle how Amazon.com, a leading online seller of books and reading materials, advance its business strategies in a global scale applying theory contemporary management in reaching its market goals effectively. This paper will specifically (a) analyze effective management and the evolution of managementââ¬â¢s ideation; (b) analyze effects, influences and changes from numerous factors using theory of contemporary management; (c) examine how management theory can be optimized in Amazon.comââ¬â¢s organization; (d) evaluate the significance and impact of information technologies in contemporary business operation; and finally, (e) appreciate how information systems are optimized to support Amazon.comââ¬â¢s managementââ¬â¢s decision-making. Theories of Management Contemporary business management is distinguished by some significant factors with other theories of management. The latter is inclusive of scientific, bureaucratic management, human relations m ovement and progressive management development (McNamara, 2012, p. 1). Scientific management theory, which is more widely practiced in the 18th to mid-19th centuries by then emerging large industries, deals with routinary tasks in the manufacturing industries (McNamara, 2012, p. 1). ... 1). The dehumanizing and enslaving relations at workplaces under these management theories motivated workers to deliberate their rights and fought for human relations movement to improve their situations in work places (McNamara, 2012, p. 1). Impelled by labor unrest and uprisings, workers demanded for business management that respects their skills, capacities and intelligence (McNamara, 2012, p. 1). They asserted, as reflected with corporate behaviorism, that organizational integrity and development could only be attained if workers rights and needs are considered by the companies (McNamara, 2012, p. 1). Bolstered by these movements, workers were capacitated, coached, and mentored for their career development and supervisory skills acquisition (McNamara, 2012, p. 1). Most workers were sent to school to acquire knowledge on effective business operation and human resource management (McNamara, 2012, p. 1). Nowadays, companies embraced contemporary management which is featured with con tingency, systems and chaos theories (McNamara, 2012, p. 1). The first theory contended that the management assume the power of decision-makings using frameworks and approaches with better leadership styles (McNamara, 2012, p. 1). Contemporary leadership adopts the confluence of transformational, transactional, principle-centered and charismatic styles to manage human resources to ascertain that they are well-motivated to meet goals while engaging clients for their respective service satisfaction (McNamara, 2012, p. 1). On the other hand, systems theory extols functional systematic operational procedures laid for workers in business operations and in human resource management (McNamara, 2012, p. 1). The system includes regular meetings, planning, implementation, monitoring,
Monday, August 26, 2019
Kathmandu PowerPoint Presentation Example | Topics and Well Written Essays - 500 words
Kathmandu - PowerPoint Presentation Example Built on an octagonal base, the place is filled with colored flags. The surrounding area of the stupa has various prayer wheels along with a large range of statues, five of which known as the Dhyani Buddhas are of special importance for the Nepalââ¬â¢s Buddhist community. A total of 50 monasteries surround the location and nearly 15% of the population in this area is Buddhists. Their characteristic living style with maroon clothing and shaven heads can be seen here in abundance. The Himalayas mountain span over a length of 1500 miles and contains the most highest mountains of the world. The famous Mount Everest can be approached by a 30 minutes flight to an airport known as Lukla airport. Upon arrival to this destination, the visitors most of whom are climbers trek to reach the Namche Bazaar, where modern facilites like internet cafes, hiking equipment, food and accommodation is available. Everest base camp is further away. It was originally the living space of the royal family of Nepal. It has been centuries since they moved away from this place, but this place still remains a main tourist spot in Kathmandu. Visitors are surprised to see the number of temples that are present in this area, which tell the story of a magnificient past of this area. The hanuman Dhoka and the Taleju Temple which was built by Mahenda Malla are famous tourist attractions in this
Sunday, August 25, 2019
How does oil and gas market effect on world economic Coursework
How does oil and gas market effect on world economic - Coursework Example There is no contention or doubt that oil and gas are the major sources of energy in the world, despite the invention of other sources of energy like Nuclear and geothermal energy, oil and gas remain the most crucial and fundamental source of energy. The economy of most countries in the world is dependent upon oil and natural gas; this has been greatly evidenced by the effect of global oil and gas prices on the prices of other basic commodities and the cost of living. This vehemently indicates that the global economy is inextricably bound with the global oil and gas market. Political crisis and interrupting in major petroleum producing countries has often had tremendous effect on global prices of all other industrial commodities. This is because oil and gas energy is the backbone of industrial activities and development. . Other factors affecting the global oil market include technical factors, pricing and marketing, Environmental issues, national security, and public policy choices a nd debates in global oil markets. According to a report released by the International Energy Agency in the year 2011, the top ten oil producers accounted for 63% of the oil produced worldwide. These giant oil producers who have a large share of the Market greatly influence the international oil market. It is also projected that USA is going to overtake Russia as the largest oil producer by 2017. The greatest share of oil production is in the Middle East and political crisis in the last few years has seen a significant increase in global oil and gas prices. ... Market regionalisation would see very great oil price disparities which is mitigated by the oil controlling cartels like OPEC (Organisation for Petroleum Exporting Countries) OPEC has dominated the global oil market for a very long time and has somehow been effective in pushing the price of oil upwards in favour of oil producers. Due to the impact that the cartel has on the prices of oil and the market in general, there have been claims that the global oil market is not a fair market. This has seen petroleum producing countries realise a lot of wealth from the oil importing countries. The cartel has been effective in keeping the prices of oil higher than it would probably be if controlled by competition in a liberal market. However oil prices are at times greatly affected by world crisis or disasters and also speculation by the traders in this multi Trillion industry The petroleum producing countries greatly impact on the global oil prices by regulating production and supply, especia lly OPEC is very instrumental in regulating production by member states thus affecting supply and demand. The organisation is also involved in marketing of oil of the member states giving them a bigger bargaining power. If traders speculate a reduction in oil, prices they push the prices up, the availability of oil in strategic reserves also affect the global oil market. These include the oil stored in American reserves and refineries and also Saudi Arabia which has a very big reserve. If Saudi Arabia for instance allows release of oil from its strategic reserves, global oil prices tend to go down. Demand of oil and gas also greatly impact on the prevailing prices, this is especially during the
Saturday, August 24, 2019
Proposing a Solution to a Problem Essay Example | Topics and Well Written Essays - 500 words
Proposing a Solution to a Problem - Essay Example Just like a prisoner, Jessa had to comply with the schedule provided. Everything within the institution follows a daily routine. As a residence of the Hospital, she lives most of her life following the house rules. At age 31, Jessa decided that she had to leave the hospital so she could learn to deal with life outside a confined area. Since she doesnââ¬â¢t know how to read and write and was enclosed in the institution for a very long time, she encountered a lot of difficulties coping with the life situation in the community. Her long stay at the institution contributed most to her lack of self-confidence and fear of trying something new. She also had a problem dealing with other people. Jessa told us that many years ago she was invited to join People First, a social institution that provides support for people with learning disabilities. At first she was reluctant to accept the invitation. It was the third invitation she received when she finally agreed to participate in the group discussion. The mission of People First is to inspire all adults with learning difficulties throughout different state to become a confident self-advocate(s) through proper teaching and guidance of the volunteers. (PAMONA, 2004) This group helped Jessa restore her self-confidence by simply attending the trainings that were provided to them. They were taught how to think positively and be confident about themselves. The self-advocacy skills were necessary to empower and encourage her not to give up on learning. They also provide her personal self-advice when necessary. The trusted people behind the People First were the main source of inspiration for Jessa in taking the necessary steps such as making her own decisions in order for her to gain control over her own life. Self-Advocacy is very important in the life of Jessa because it made her realize that as a human being, we all have the right to be treated equally with respect and dignity. (People First of Norfolk, 2007) In line with
Friday, August 23, 2019
English Literature Essay Example | Topics and Well Written Essays - 2500 words - 2
English Literature - Essay Example This effect is what brings the reading of poetry closer to its goal ââ¬â the experience of life. One such device used to make poetry an expression of the truth and a tool to convey meaning is the structures of lines. The length and brakes of the lines, sentence structure and visual layout of the poems and the usage of ââ¬Ëenjambmentsââ¬â¢ all contribute to the conveyance of intended message of the poetry. In this essay I shall analyze how the structures of the poetic lines convey meaning of the poems taking the ââ¬Ëromantic poemsââ¬â¢ as the central theme. In other words I shall evaluate the relationships between different poetic constructions of lines or structures and their effects in the meaning that we take form it. I shall analyze following five popular romantic poems giving examples of different structures of lines used within them: William Blakeââ¬â¢s ââ¬ËThe Tygerââ¬â¢, William Wordsworthââ¬â¢s ââ¬ËDaffodilsââ¬â¢, S.T Coleridgeââ¬â¢s ââ¬ËKubla Khanââ¬â¢, P.B Shelleyââ¬â¢s ââ¬ËOzymandiasââ¬â¢ and John Keatsââ¬â¢ ââ¬ËOde on a Grecian Urnââ¬â¢. William Blakeââ¬â¢s The Tyger is one of the most analyzed and discussed poems of the Romantic era in which Blake tries to demonstrate the world of corruption and repression with a rather stark and creepy choice of words and expression. He exhibits the darker forces of the world using similar dark selection of sentence structures and words. George Ehrenhaft (2008, p.118) argues that ââ¬Å"To understand a poem you must understand its tone. The tone of William Blakeââ¬â¢s ââ¬ËThe Tygerââ¬â¢ has long puzzled and intrigued readers. To this day, therefore, more than two centuries after it was written, the poem remains an enigma.â⬠Talking about the visual layout of the poem, there seems to be enough elements that Blake uses to communicate to his readers. The stanzas and the lines are deliberately kept short and brief, probably to intensify the fearful and intimidating effects of the ââ¬ËTygerââ¬â¢. Shortness of the lines symbolizes fear and
Thursday, August 22, 2019
Science fiction has less to do with science and more to do with an Essay
Science fiction has less to do with science and more to do with an endless reworking of the human condition - Essay Example Science fiction has a lot of admirers around the world. It is widely discussed and paid much attention to. It is a kind of innovative representation and reconsideration of human conditions. In accordance with Jules Verne called, his novels were ââ¬Å"voyages extraordinaireâ⬠, and H. G. Wells was writing in the field of ââ¬Å"scientific romance.â⬠It is rather difficult to understand the main idea of the authors of science fiction. On the one hand, they are focused on discussing allusions or different fake representations of different issues (Westfahl and Slusser, 2002). On the other hand, they follow the laws of the human nature development. Very often the main characters of science fiction novels are humanized. They are often very much concerned about human feelings, such as love, friendship etc. and this makes science fiction more attractive. Very often these stories gain approval of a various audience. For example, women who usually do not like such reading can also re ad these stories and not be afraid of different interesting or unreal creatures. In any case, different readers have their own chances to underline what they want to read in the science fiction books. Publishers are printing what readers will like for sure. There is no doubt that the authors of science fiction books introduce an innovative vision and creative ideas. It is surely a literature of change. For example, in the novels by Isaac Asimov humanity is fighting against the fall of the Galactic Empire. This author made an attempt to popularize science. Thanks to his creative mind he managed to represent the issue of biochemistry in a popular manner. He followed his scientific logic and managed to represent it to the readers in a comprehensible manner. He wanted to understand a possible future of the generations that concerned human ability to rule their future empires. He turned his attention to so-called scientific sociology. In case mankind colonizes galaxy, it will be very
Alcohol - Underage Drinking Essay Example for Free
Alcohol Underage Drinking Essay Did you know that approximately one teenager between the ages of 14 and 17 die each week as a result of underage drinking? If thatââ¬â¢s not alarming, research is saying that teenagers who frequently binge drink, are more likely to use drugs like cocaine and have sex with six or more partners and receive very poor grades at school. Good morning / afternoon and fellow students, Iââ¬â¢m here today to convince you that alcohol consumption amongst teenagers should be reduced in order to eliminate serious injuries and deaths, reduce unsafe sexual activity and violent behaviour particularly in male teens. Despite being educated about alcohol consumption, binge drinking amongst teenagers is increasing at an alarming rate. Statistics show that teenagers who drink alcohol will take risks and put themselves in dangerous situations. As a result, more than sixty teenagers are hospitalised each weekend in Australia from alcohol related injuries. In the short term binge drinking can cause harm such as vomiting, hangovers and alcohol poisoning; however over a long period of time it may lead to more serious health issues such as alcohol dependence, brain and liver damage. Did you know the human brain is not fully developed until we reach the age of 25? What many of you donââ¬â¢t understand is that at this age, your brain is still forming critical parts needed for learning, memory, planning, emotional stability and thinking. Teenage binge drinking prevents the brain from developing properly and can cause permanent damage. In addition to the health risks, drinking alcohol impairs your judgement and the ability to make correct or safe decisions. Recent studies show there is a link between teenage drinking and high risk sexual activity. For example, teenagers who drink alcohol are more likely to have multiple sexual partners and unprotected sex, resulting in unwanted pregnancy and sexually transmitted diseases. A recent survey also showed that approximately 10 percent of female high school students had reported being raped. Plain and simple, alcohol alters your ability to think clearly. A study conducted in Great Britain revealed that: After drinking alcohol, one in seven 16-to-24-year-olds have had unprotected sex, while one in five have had sex that they regretted and one in 10 said they had been unable to remember if they had sex the night before. Do you want to be one of these statistics? When young males tend to drink some start to become violent and aggressive and try to create fights. The worst case scenario is someone getting killed. Aggressive, delinquent behaviours, especially amongst male teenagers often result in hospitalisation. Assaults such as king hits, glassings, stabbings and physical abuse are on the increase. Recently on a Saturday night, St Vincents hospital in Sydney recorded no less than 65 people being admitted with bloodied faces, teenagers passed out on stretchers and many innocent victims of alcohol fuelled violence. Seriously, could you live with yourself knowing you had injured a good friend? I know I couldnââ¬â¢t. Underage drinking, even so-called light drinking is dangerous, illegal, and must not be tolerated. Everyone including parents, schools, sporting clubs and anywhere young people gather should work together to deliver the message that underage drinking is not OK. Teens that drink alcohol run the risk of being seriously injured, they engage in unsafe sexual practices and boys can become extremely violent. I urge you not to binge drink.
Subscribe to:
Posts (Atom)